Jump to content

Riverside–Leslieville station

From Encyc
This photo shows a new bridge for the Ontario Line being built immediately west of older heavy rail lines. In addition a TTC streetcar is visible, traveling West on Queen Street.

Riverside–Leslieville station will be a subway station on Toronto's Ontario Line.[1]

The Ontario Line superceded an early rapid transit route, known as the Downtown Relief Line (DRL), which followed a similar route, and shared several stations with existing subway lines. The Downtown Relief Line also had planned for a station in Leslieville, but at a slightly different location. All the stations on the DRL were to be underground, while the Ontario Line has several above ground portions.[2] An aboveground portion, several kilometers long, where the route emerges and shares the right-of-way of existing heavy rail routes, includes Riverside-Leslieville station.

Neighbouring stations Gerrard station and East Harbour station will also be above ground.[3] 30,000 people will live within a ten minute walk of one of these three stations.[4]

Some people who lived near the station objected to the increased noise from increased use of the right of way.[1]

References

[edit | edit source]
  1. ↑ 1.0 1.1 Philip Lee-Shanok (2024-01-25). "Metrolinx on collision course with residents, council over building part of Ontario Line above ground". CBC News. Archived from the original on 2021-02-06. Retrieved 2025-01-03. Despite opposition from many in the community and from Toronto city councillors, it may be full steam ahead to run the Ontario Line above ground through Leslieville and Riverside.
  2. ↑ Jack Landau (2024-01-21). "Here's how a Toronto subway station will be built into a bridge". blogTO. Archived from the original on 2024-01-10. Retrieved 2025-01-03. The Queen Street bridge, mid-way between Broadview and Carlaw, is not only being expanded to support new tracks, but also the Ontario Line's elevated Riverside-Leslieville Station.
  3. ↑ "Metrolinx begins work on Ontario Line". Mass Transit magazine. 2023-07-25. Archived from the original on 2023-07-25. Retrieved 2025-01-03. The bridges, which currently accommodate both GO Transit and VIA Rail services, are located within the shared rail corridor where Ontario Line tracks will also run. The bridges need to be replaced to reposition existing GO tracks to make room for the Ontario Line and for expanded GO services. Ontario Line bridges will be built next to the new GO rail bridges. Metrolinx notes replacing the old bridges will with upgraded infrastructure will make sure the new bridges last for at least another 100 years.
  4. ↑ "Riverside-Leslieville Station". Metrolinx. 2021-06-24. Retrieved 2025-01-03. A night out on the Danforth, a soccer game at Exhibition Place or a trip to the Science Centre will be made easy for the 9,500 residents who are expected to live within a 10-minute walk of the new station by 2041.